- On-site pipe welding (over 25km of DN600 – DN1000 MSCL Pipe)
- Spool fabrication (approximately 700 spools DN25 – DN1500 SS & MSCL Pipe)
Photo of purpose built, Smart Fab site trucks welding on the NSISP project.
Eastern Pipeline Package
Prime Customer: SA Water – Leed Engineering & Construction
Scope of work: Smart Fab’s involvement on this $30 million project was as the sole subcontractor for all shop spooling & site welding of the 12km of MSCL pipe. This included up to (7) site crews each consisting of up to (3) confined space welders & labourers. Also included was a large amount of workshop spools; isolation valves, air valves, bends etc. The pipe ranged from DN150-DN1000 & Smart Fab is proud to boast that with thousands of welds completed we still managed a 99.5% NDT pass rate. All pipe materials free issued.
Wattle Park, Clapham & Gilberton Pump Station
Prime Customer: SA Water – Guider O’Conner (GOC)
Scope of work: Site welding of various site MSCL & stainless spools for the 3 pump stations. Included modifications to pipework as well as supply of stainless & mild steel spools. All welding to AS4041, 100% NDT & 100% 3rd party visual inspection.
Photo of above ground MSCL fittings for Wattle Park. Project was re-designed for noise reduction purposes.